In Williams Tarr Construction Ltd v Anthony Roylance Ltd and another, the TCC considered a construction company’s breach of contract and breach of warranty claim against an engineer for the defective design of a retaining wall.
Williams Tarr Construction Ltd v Anthony Roylance Ltd and another
Williams Tarr Construction (WTC) was engaged in construction works at the former Albany Mill in Congleton, Cheshire. The works included the construction of a retaining wall as the construction site sloped. Construction Site Services (UK) Ltd (CSS) was contracted to install the retaining wall and Hy-Ten Gabion Solutions (Hy-Ten) provided and designed the gabions to construct it of stone-filled gabion baskets.
During construction of the wall in September to October 2010, a band of running sand was encountered which meant that water flows behind the retaining wall were greater than had been anticipated. This required a drain to be put in behind the retaining wall.
In November 2010, one of the defendants was engaged to provide civil engineering services. There was a dispute about whether it was Anthony Roylance Ltd (ARL) or Mr Roylance personally that had a contract with WTC, but there was no dispute about the fact that one of them had a contract with WTC to provide civil engineering services.
The main dispute between the parties was the scope of the engineering services:
- The claimant argued that either of the defendants had been engaged to provide a solution to the problems with the retaining wall, so as to provide an overall design for the retaining wall that ensured the retaining wall was fit for purpose.
- The defendants argued that either one of them had only been engaged to design the drain behind the retaining wall, and that the obligation was only to exercise reasonable care and skill in that respect.
It should be noted that Mr Royson had produced a number of drawings in relation to the retaining wall, but it was argued that these merely reflected the design initially provided by Hy-Ten.
Once the retaining wall (and the drain) were constructed, the retaining wall was found to be defective. Further works were needed to the wall, including extensive piling. There was no allegation that there was a deficiency in the design of the drain behind the retaining wall. WTC sued both defendants as CSS was insolvent.
Which defendant contracted to provide the services?
HHJ Eyre QC found that Mr Roylance had contracted personally for the services. The factors the influenced the court’s decision were that:
- Mr Roylance had not at any time mentioned his connection with ARL.
- The exchange of emails which constituted the engagement appeared to be from Mr Roylance in his personal capacity.
- The majority of the documents that Mr Roylance had sent to WTC were sent from his personal email account.
- His invoices stated payment was to be made to “Anthony Roylance”.
- “Anthony Roylance” was the name on the professional indemnity insurance certificate.
- The company name was not on the letterheads used by Mr Roylance or otherwise mentioned in correspondence.
What was the scope of Mr Roylance’s appointment
The court decided that Mr Roylance was only engaged to design a drain using reasonable care and skill, and not to design the retaining wall. Furthermore, he had not warranted that the retaining wall would be fit for purpose.
The court considered the fact that Mr Roylance’s role in the retaining wall construction before November 2010 (when he was engaged) was before any agreement with WTC. Any agreement or obligations Mr Roylance may have had in relation to the retaining wall with any other party (such as CSS) did not automatically create obligations to WTC in relation to the retaining wall. Such obligations would have had to have been carefully spelt out under the agreement with WTC.
The court found that although others may have subsequently contributed to the design of the wall, the originator of the design was Hy-Ten and, in substance, the design of the wall was Hy-Ten’s. Mr Ryson produced drawings that were used and intended to be for construction purposes for the retaining wall, but that was in a context where he was developing the design produced by Hy-Ten and adding material to it so it could be used for construction. Therefore, Mr Royson was not the designer of the retaining wall nor had accepted overall responsibility for the construction of it.
Interestingly, the judge did say, obiter, that if he had found Mr Roylance subject to an engagement to design the retaining wall, he would have found himself subject to a fitness for purpose obligation. This is because (according to the judge):
“… if there had been such an engagement, it would in context have been one to remedy the problems with the Retaining Wall and not just to exercise care and skill in the further design work.”
Comment
The decision is interesting for the fact that a designer who had taken another designer’s drawings and added to them was found, in this case, not to have taken on responsibility for the whole of the design. However, the decision is fact specific and so it cannot be ruled out that a designer who adapts a previous designer’s drawings may be found to have accepted responsibility for the overall design.
The decision is also interesting for the standard of care found not to have existed in this case. Clearly the decision maintains the view that a professional’s usual obligation is to use reasonable care and skill. However, the judge’s obiter comments appear to support the proposition that, where the agreement or engagement of the professional is one to remedy problems with an existing construction, the obligation will be one of fitness for purpose and not just to exercise reasonable care and skill. Designers should therefore exercise extreme caution when undertaking designs to remedy defects or issues in existing construction works.
Decisions implying fitness for purpose obligations into contracts with professionals and/or designers are always a cause for concern, because of the extent of coverage provided by professional indemnity (PI) policies. PI policies generally cover third party claims arising from negligence (that is, a lack of reasonable care and skill), but not any further or more extensive standards of care assumed under contract.
Therefore, concern is justified from both sides of the litigation coin:
- Professionals will find that their liability is not covered.
- Those suing them may find that they are unable to recover the full extent of their losses as against the designer due to a lack of insurance cover.
An unhappy result for all concerned.
Designers and professionals will therefore wish to review the wording of their agreements, particularly in cases where they are producing designs to provide a remedy for defective works, to ensure they contain an express term concerning the standard of care, or otherwise to check with their insurer to confirm what they are (and are not) covered for.
This article was first published on Practical Law’s Construction Blog.
Disclaimer
This content is provided free of charge for information purposes only. It does not constitute legal advice and should not be relied on as such. No responsibility for the accuracy and/or correctness of the information and commentary set out in the article, or for any consequences of relying on it, is assumed or accepted by any member of Chambers or by Chambers as a whole.